– Present
Senior IT System Administrator
Pattern Energy Group Services LP
- Design, build, and provide Tier 3 support for on-prem and cloud infrastructure: 1,000+ users, about 150 servers, seven US/Canada sites; VMware vSphere (vCenter/ESXi) as the primary platform.
- Administer the company's user directory and sign-in (hybrid identity): on-prem Active Directory (domain controllers, sites, DNS, DHCP, Group Policy); built the Entra Connect sync to Entra ID.
- Led the Microsoft 365 migration (Exchange Online, SharePoint, Teams) for 800+ users.
- Designed the company's Azure foundation (landing zone: hub-and-spoke networking, identity), began the build, and handed it to a newly formed cloud team.
- Built Azure Virtual Desktop hosts in production as personal desktops, one per user.
- Built the PowerShell offboarding tool the Service Desk now runs (AD, Exchange Online, Microsoft Graph, OneDrive export, license removal): about 15 manual steps became one script run plus two or three by hand; hands-on time per termination fell from over 90 minutes to about 30 minutes, and steps no longer get missed.
- Replaced LANDESK with SCCM, then integrated Intune with Patch My PC for third-party patching.
- Rebuilt OS imaging and task sequences, then used them to move about 550 devices from Windows 7 to 10 and about 800 from Windows 10 to 11.
- Rolled out Defender for Endpoint; reviewed and tightened Group Policy security baselines on servers and PCs.
- Produced control evidence and remediated findings for SOX IT general-controls audits during Pattern's years as a public company.
- Run the internal PKI (Active Directory Certificate Services) and renew and install internal and public SSL/TLS certificates; renewed the original CA certificate and built a two-tier CA (offline root, online issuing).
- Lead the response to major incidents and recurring problems across the Infrastructure, Security, and Service Desk teams, including the cases vendor support could not close.
- Acted as primary technical contact when Microsoft licensing moved from CSP to an Enterprise Agreement.
- Rack, build, and run the hardware: Cisco UCS blade chassis and Dell rack servers; Dell PowerVault and Synology storage; a two-node HPE dHCI cluster (HPE ProLiant nodes, Nimble/Alletra storage) on vCenter/ESXi.
- Built a Windows Server 2022 Hyper-V failover cluster, ready as a second virtualization platform beside vSphere.
- Migrated an acquired team's 1.3 PB of research data to Dell PowerVault storage and moved its servers from end-of-life CentOS to Ubuntu.
